Handover-ready, not just swept.

Rough, final, and touch-up cleaning for new build, refit, and tenant improvement — scoped to the handover date rather than to a day rate.

Request a walkthrough 855-835-0835
  • Stages

    Rough, final, touch-up

  • Trigger

    Trades complete, per stage

  • Window

    Scheduled to handover

  • Reporting

    Punch-list sign-off

Overview

The last trade on site.

Post-construction cleaning fails for a predictable reason: it is scheduled as one visit at the end, on a date set before anyone knew when the trades would actually finish. The crew arrives to find two trades still working, cleans behind them, and everything is dusty again by the walkthrough. The general contractor then pays twice and the handover slips anyway.

We scope it in three stages tied to trade completion rather than to a calendar date. Rough clean clears debris and heavy dust so the finishing trades can work. Final clean is the detailed pass — glass, fixtures, floors, everything touched. Touch-up happens immediately before handover, after the last boot has left. Each stage has its own trigger, its own scope, and its own sign-off.

What's included

The starting scope checklist.

Rough clean

  • Construction debris removed and staged for the site skip
  • Heavy dust removed from floors, ledges, and structure
  • Stickers, labels, and protective film removed from fixtures where safe
  • Areas made safe and workable for the finishing trades

Final clean

  • All glass cleaned inside and out, including frames and tracks
  • Fixtures, fittings, switch plates, and hardware detailed
  • Cabinetry cleaned inside and out; drawers and shelves wiped
  • Floors cleaned to their finished specification, not just swept

Detail work

  • Paint, adhesive, mortar, and grout residue removed from finished surfaces
  • High dusting of vents, sprinklers, light fittings, and exposed structure
  • Restrooms commissioned — fixtures, mirrors, dispensers, and floors
  • Mechanical and electrical rooms cleared and wiped down

Touch-up & handover

  • Final pass after the last trade has left the building
  • Fingerprints, footprints, and settled dust removed
  • Punch-list items from the walkthrough closed and signed off
  • Building left ready for photography or tenant arrival

Scope is written per site during the walkthrough. This is the starting checklist, not the ceiling.

Want this scope written against your property?

Request a walkthrough 855-835-0835

Program options

Program shapes, not packages.

We do not publish prices. Scope and price are written per site after the walkthrough — these are the shapes this service usually takes.

Post-construction cleaning program options by profile, timing window, and reporting
Stage Trigger Typical duration Sign-off
Rough clean Structure and rough-in complete One to three days Site supervisor
Interim clean Between finishing trades As required Site supervisor
Final clean All trades complete Two to five days Punch-list walk
Touch-up Immediately pre-handover Half day to one day Handover walk
Tenant improvement Occupied building, phased Per phase Per phase
Post-handover Snagging and defect work As required Per visit

How it works

From walkthrough to first shift.

  1. Walkthrough

    We measure the areas, note access and traffic, and record current condition — usually within 4 hours of your request.

  2. Written scope & pricing

    Task list, cadence, and price in writing, area by area. Nothing agreed verbally.

  3. Onboarding

    Assigned supervisor, named crew, keys and access logged, and a start date you can hold us to.

  4. Supervision & inspection

    Scheduled walks against the written scope, with corrections raised and closed in writing.

Properties we do this for

Where this program runs.

Equipment, products & standards

What the crew arrives with.

  • Stages triggered by trade completion, not by a date fixed in advance
  • Methods matched to finish — no abrasive on architectural metal or coated glass
  • Protective film and adhesive removed without scratching the substrate
  • Debris segregated and staged to the site waste plan
  • Crews inducted to the site’s safety requirements before starting
  • HEPA vacuums on fine construction dust, including in ductwork surrounds
  • Punch-list walked with your supervisor and closed in writing
  • Occupied-building phasing kept dust-separated from working tenants

Green-cleaning credentials and third-party certifications are held for {{GREEN_CREDENTIALS}} and {{CERTIFICATIONS}} — nothing is claimed here that has not been supplied and verified.

Why Unison for this service

Three things that hold the standard.

  • Staged to the programme

    Each stage has a trade-completion trigger, so you are not paying a crew to clean behind an unfinished ceiling.

  • Finishes are respected

    Architectural metal, coated glass, and new stone each get a method. Damage at handover is the most expensive kind.

  • Signed off, not assumed

    The punch-list is walked with your supervisor and closed in writing before the handover walk.

  • Licensed
  • Bonded & Insured
  • Background-Screened Crews
  • Directly Employed Crews
  • Written Scope & Pricing

Insurance limits render from {{INSURANCE_DETAIL}}. A service-relevant testimonial is reserved here and withheld until real attribution is supplied.

Service areas

Post-construction cleaning across Southern California.

All service areas →

Related services

Often run alongside.

  • Window cleaning

    Interior and exterior glass on a schedule matched to the elevation and season.

    Explore glass →

  • Floor care

    Hard-surface programs scheduled against traffic rather than the calendar.

    Explore floor care →

  • Commercial janitorial

    Recurring nightly and day-shift cleaning for occupied buildings.

    Explore janitorial →

Frequently asked

Post-construction cleaning, answered.

When should we book you in?

At programme stage, not at the end. Booking the rough clean early means the finishing trades work in a clean building, and it lets us hold crew for the final and touch-up stages when your dates inevitably move.

What is the difference between rough, final, and touch-up?

Rough clears debris and heavy dust so trades can finish. Final is the detailed pass over every surface once trades are complete. Touch-up is the short pass immediately before handover, after the last boot has left. Skipping touch-up is the most common reason a final clean looks like it failed.

Do you remove protective film and stickers?

Yes, where it is safe to do so at that stage. Some films are best left until touch-up; removing them early just means the surface gets dirty again. The scope says which, per surface.

Can you work in an occupied building?

Yes — tenant improvement work is phased and dust-separated from working tenants, with timing agreed around their hours. That phasing is part of the scope rather than something worked out on the day.

Who removes the construction waste?

We clear and stage debris to your site waste plan. Skip hire and off-site disposal are the contractor’s unless written into our scope explicitly.

What if the programme slips?

It usually does. Because our stages are triggered by trade completion rather than a fixed date, a slip moves the trigger rather than burning a booked visit. We ask for notice, not a penalty.